Via L. Autobianchi 21/G, 20033 - Desio, Milan - Italy

Ph. +39 0362 18 20 040 - Fax +39 0362 18 20 039

Copyright © Idrogen2

Rettangolo arrotondato: BUILDING

Idrogen2 has designed a new electrolyser with low cost and high efficiency, availability and safety for on-site use, that can be installed in civil and productive building.

Energy storage using hydrogen production is high efficient (more than 85%), and so you are able to use off-peak and renewable energy.

The hydrogen produced can be used into fuell cell for electric energy production (when do you need it), or mixture with CNG for heat production (H2&CNG).

Pay back time is less than 4,5 years.

Hydrogen is not a dream, anymore

SEVENTH FRAMEWORK PROGRAMME

H2SusBuild

RENEWABLE

ENERGY

CNG

GRID

ELECTRIC

GRID

OFF PEAK